Corrosion Under Insulation (CUI) remains one of the most persistent
IMS PEI – Pressure Equipment Integrity
Manage equipment integrity through RBI and advanced corrosion calculations
IMS PEI is a Pressure Equipment Integrity cloud-based software. It helps prevent leaks and explosions by improving your asset availability through inspection planning.
You don’t need to have an expensive inspection schedule to ensure the safety of your people and high asset availability. With IMS PEI, you will optimize your inspection schedules so that you can operate as safely and budget-friendly as possible.
| Title | Description |
|---|---|
| Theme/Discipline | Certification & ComplianceIntegrityInspectionCorrosion ManagementTurnaroundsAbandonment & Decommissioning |
| Core Tech | Simulation SoftwarePlanning & ProductivityData Management & Collection |
|
Certifications / licences
|
ISO 9001, Microsoft Gold Partner, SAP Certified, IEC612511, EEMUA 159
|
|
Areas of Application
|
Refineries, Terminals, Tank farms, Chemical plants, Process facilities, Pulp mills, Pipelines and Wells, Mines, Onshore & offshore production facilities, Chlor-alkali plants.
|
|
Compliance
|
API 580, S-RBI Methodology, Auditable Events, W-IMS Platform (RCM, SIFpro), API Standards
(580, 581, 571, 584, etc.) |
|
Data Analysis
|
The data analysis part (s-IDAP) calculates alternative corrosion rates. Extreme Value Analyses for corrosion calculation. Liquid release calculators. Likelihood of failure calculators. CUI Prioritisation calculator. Bulk data statistical analysis.
|
|
Hosting
|
Access your data anytime and anywhere with this web based solution. Available as shared or dedicated hosting as well as on-premises, with state-of-the-art security systems.
|
|
Interface
|
Increased productivity with tailor-made interfaces to your ERP systems (e.g., SAP, JDE, Maximo).
|
|
Methodology
|
The enhanced synergy of RBI with RCM and SIS Assessments. Qualitative method, but with quantitative parts.
|
|
Reporting
|
Configurable dashboards, KPIs, and reporting features, including 3D visualization.
|
|
Services
|
World-class support desk with over 20 years of experience. 3 releases per year, with agile development. Training – on-site and open Sessions.
|
|
Usability
|
Pressured Equipment, Tanks, Flanges, Relief Devices, Civil Structures, Floating installations
(FPSO, FLNG & FSRU), LNG liquefaction & regasification, Mining & mineral processinG |
Latest Updates
--CANCELED --
Attention all reliability and integrity experts across Australia
--PAST EVENT --
Watch the recording of the webinar
The Technology Readiness Level (TRL) indicates the maturity level of novel technologies. Learn more about the TRL scale used by us.
[9/9]
Relative Business Impact
Sign up or log in to your Explorer Plus or higher plan to get access to all the 13 deployment references.
Last Deployment Year