ReLine WL
Expandable - Wireline Deployed Casing Patch
Page last modified
June 30 2024
Wireline deployed straddle utilizing our expandable technology allowing for isolation of wellbore issues whilst providing a maximized post installation ID. The optimised post expansion ID enables continued wellbore access, future intervention, optimizes production rates & maximizes well lifecycle.
Key Features
- Shoeless design (no drill out of shoe required post install)
- High expansion capabilities
- Stackable design with metal to metal sealing, allowing multiple patches to be stacked
- Recessed seals whilst RIH to optimize RIH OD
- Available in carbon steel or CRA materials and with gas tight sealing capabilities
- Deployable on E-line & Coil tubing
- Expandable technology allows for far larger post installation ID's than conventional methods
Common Applications
- Isolation of tubular leaks
- Isolation of unwanted water, gas & sand ingress
- Corrosion isolation
- SSSV remediation
- Isolation of leaking/compromised completions components
Pros & Limitations
1
One-trip system, with no shoe drill out required
1
Larger post installation ID than conventional straddle systems
1
Stackable with metal to metal seals to create longer straddles to suit specific applications
1
Available in standard carbon steel or application specific CRA materials
1
Configurable with smart completion products such as AICDs to provide comprehensive workover solutions
0
When deploying on E-Line, only one straddle joint can be deployed per trip (~40ft). If patching a long section, multiple trips would be required with this system to stack straddles
Specification
Title | Description |
---|---|
Theme/Discipline | Well OperationsProduction TechnologyIntegrity |
Length
|
Up to ~40ft deployable in one trip
|
Stackable
|
For longer sections, patches can be deployed consecutively and stacked to create a longer patch with metal to metal seals
|
Deployment Method
|
E-Line or Coil
|
Reviews
Technology Readiness Level
The Technology Readiness Level (TRL) indicates the maturity level of novel technologies. Learn more about the TRL scale used by us.
[9/9]
Development
Technology demonstration
Mature / Proven