0
Like
The pre shutdown refractory inspections give a good picture of the status of the refractory, which allows most of the maintenance to be determined before the stop. This will result in a more accurate and faster maintenance schedule.
Specification Title | Specification Description |
---|---|
Areas of Application
|
Petro industry and waste to energy.
|
Capabilities
|
Inspections high temperatures | Optimize combustion processes
|
Certifications / licences
|
ISO 9001 / VCA petrochemistry.
|
In-service inspection possible
|
Yes
|
Inspection
|
Detailed 4K shots over a long distance.
|
Temperature
|
Max. 1400 C
|
Sign up or log in to your explorer or platform subscription to get access to the reviews written about this technology.
The Technology Readiness Level (TRL) indicates the maturity level of novel technologies. Learn more about the TRL scale used by us.
[9/9]
Sign up or log in to your explorer or higher plan to get access to all the 4 deployment references.
Last Deployment YearTotal DeploymentsComment