Octopoda
Intervention of live annuli to reinstate integrity
From diagnosis of annulus integrity issues to delivery of the remediation solution and securing of the well, Expro can extend the production cycle of your well stock and reduce the risks of well barrier envelope breach to ALARP. Integrity issues in the annulus are a growing concern, and affect an estimated 30% of wells globally - negatively impacting our environment and industry. Operators and Duty Holders are continually seeking effective methods to manage annulus integrity issues, extend the production cycle of existing well stock and reducing plug and abandonment (P&A) costs.
To answer these challenges Expro has developed Octopoda™, a system that can access the annulus where others cannot. It is the go-to solution for the targeted remediation of annulus integrity issues.
Octopoda™ is more than just a product; it’s a strategic investment in the continued safe and reliable production of your well stock, delivering integrity, efficiency and sustainability
Specification Title | Specification Description |
---|---|
Applications
|
Remove shut-in casing pressure, Casing integrity issues, Corrosive fluid displacement, Downhole spotting of resin, Diagnostics, Environmental and groundwater protection, Preparation for plugging and abandonment
|
Benefits
|
Significantly reduced cost, high rewards, Smaller footprint and lower personnel requirements, Rapid mobilization, Increased oil recovery through revitalization of shut-in wells, Environmental and groundwater protection
|
Features
|
First conventional annulus intervention system, Reduces requirement for workover rig or heavy equipment, Customizable to different annuluses and well types, Well recovery by restoring integrity and production
|
Reviews
Sign up or log in to your explorer or platform subscription to get access to the reviews written about this technology.
The Technology Readiness Level (TRL) indicates the maturity level of novel technologies. Learn more about the TRL scale used by us.
[7/9]