Presentation: 24-months of continuous increased production using a topside desander

Published on
Instrumentation & Measurement
Process Equipment
Sand and Solids Management

At the "Sand Management Euroforum 2024", FourPhase presented a case study on continuous solids-free production on the UKCS. The case study shows how an operator went from a shut-in-well to producing more than 1 000 bbl/day. Read more about the process and how FourPhase can help optimise production on most sand or solids-producing wells.

 The full presentation is available in the news section at FourPhase.com or by clicking the link below.

https://fourphase.com/article/presentation-24-months-of-continuous-increased-production-using-a-topside-desander/