Thru-tubing casing and cement evaluation
Problem statement:
The challenge is two-fold:
1) A thru-tubing casing logging tool capable of detecting pitting corrosion on the internal 9-5/8” casing without retrieving the 4.5” tubing.
2) A thru-tubing cement bond log tool that can evaluate cement quality behind the 9-5/8” casing, also without retrieving the 4.5” tubing.
Expected Outcome:
1) The casing logging tool must provide 360-degree azimuthal corrosion mapping and detect pitting corrosion as small as 4 mm in diameter. Current industry-standard electromagnetic imaging tools typically offer only average circumferential wall loss data.
2) The thru-tubing cement bond log must deliver results comparable in quality to those obtained from conventional casing CBL tools. Note: Some NOC completions include up to seven control lines, which may pose an obstruction to these logging operations.
North Oil Company is a joint-venture between Qatar Petroleum and Total. Our objective is to redevelop and maximise production from the Al-Shaheen oil field over the next 25 years. Al Shaheen is situated off the north east coast of Qatar and is one of the largest and most complex oil fields in the world. Its 100 million barrels per annum comprise 45% of Qatar’s oil production. We aim to become a leading offshore operator through leveraging new and innovative technologies while simultaneously applying the highest standards of safety and operational excellence.
Contact Us
This challenge is closed/archived. If you would like to know more about challenge or want to submit a solution, contact us by using form below. We will get back to you within 2 working days.