Removing mud residues/deposits behind sand screens

Challenge Overview
Well OperationsProduction TechnologyOil
Description

We have a well with a minimum ID of 2.650". The well is completed with sand screens with pre-drilled base pipe. We suspect that poor mud quality from drilling phase might have introduced debris behind the screens which is affecting production. 4" screens.

 

The production from the well is much lower than expected. Debris behind screens is main theory, but has not been confirmed. Looking for Intervention solution to remove the suspected debris.

 

Location where the technology is required
Norway
Closed
Related images
Related images
Equinor
Equinor

Contact Us

This challenge is closed/archived. If you would like to know more about challenge or want to submit a solution, contact us by using form below. We will get back to you within 2 working days.

  • Potential Solutions

View our technology suggestions:
Request a trial for your company today!

  • Get access to suggested solutions for this challenge.
  • Find the best solutions for your challenges through our global community.