Remedial sand control for wells

Challenge Overview
Well ConstructionWell OperationsSand and Solids ManagementOilGas/LNG
Description

On the Statfjord assets in Norway we have a number of sand screens that have lost its integrity and the wells now produce sand. We are looking for a solution to stop the sand production but keep the hydrocarbon production going at full rate.

This solution needs to;

pass through ID of 4.680" with screens basepipe min ID 4.892" (B-4 -see attached CSD)

pass through ID of 4.695" with screens; 6 5/8" 24# EHS (C-18- see attached CSD)

pass through ID of 3.922" with screens; 4" 10.9# EHS (C-22 - see attached CSD)

pass through ID of 4.680" with screens; 6 5/8" 24# EHS (C-38 -see attached CSD)

 

Location where the technology is required
Norway
Closed
Related images
Related images
Equinor
Equinor

Contact Us

This challenge is closed/archived. If you would like to know more about challenge or want to submit a solution, contact us by using form below. We will get back to you within 2 working days.

  • Potential Solutions

View our technology suggestions:
Request a trial for your company today!

  • Get access to suggested solutions for this challenge.
  • Find the best solutions for your challenges through our global community.