Gas Breakthrough Wells | Proper Shut-off Solution
Challenge: wells are producing high GOR from day one ranging from 1000 to 2000 m3/m3 and other wells suffer from gas breakthrough after some time of producing the wells.
These wells can be GL wells with high formation gas from the reservoir or self-flow wells with high GOR.
key requirements:
1. Technical info and specs about the technology that can control high GOR wells and produce at economic rates.
2. Recent case histories preferably in in middle east and GCC if any.
3. How this technology will add value.
4. Indicative cost of the technology if available and can be indicated at this stage.

Petroleum Development Oman
Submit Solution / Ask Question
Are you a solution provider and have a solution? Share your solution directly with the challenge owner. TechnologyCatalogue.com is providing this as a service to the challenge owner, there are no fees/commission payments for solutions submitted.
Are you an end-user or technical expert and have dealt with the same challenge or would like to connect with the challenge owner? Respond to the challenge here to get in touch with the challenge owner to share experiences!