Controlling water production from mature fields
Challenge Overview
Production TechnologyWell OperationsControl System/EquipmentOil
Description
Water production in our field is at +90% and we are looking for a technology that can help in controlling water production inside the wellbore, which is different from an AICV.
Please contact us in case you can provide a solution for this challenge.
Location where the technology is required
Oman
Published
Undisclosed client
This company prefers not to disclose their details with the challenge.