Artificial lift - sucker rod pumps for sandy wells
Challenge Overview
Well OperationsProduction TechnologySand and Solids ManagementRotating EngineeringOil
Description
We have 40% of wells in unconsolidated formation and artificial lift, and the main cause of MTBF (Mean Time Between Failure) limitation for downhole equipment is sand issues in downhole pumps. Approximate number of wells in this situation is 1500 wells.
Please contact us in case you have a downhole pump solution that is less susceptive to sand failures.
Location where the technology is required
Romania
Deadline: November 30, 2024
Closed
OMV Petrom